Bidding Hot: titanium  tita  MACHINERY  mobile  pipe  battery 
 

HCH Duct Auto-line

Click image to view original image
Price: 40000.00$/
Min.Order: 1
Supply 1
Delivery: Shipment within 63 days since the date of payment
Address: Asia China
Valid until: Never Expire
Updated on: 2017-01-23 22:49
Hits: 27
Enquiry
Company Detail






 
 
Details

 HCH Duct Manufacture Auto-line VI

Auto duct line VI is our latest auto duct line. With U type structure, it cover less space and reduce time of plate passing which achieves the productivity of each duct into twenty to twenty-three seconds. This full-auto line can complete the following processing once time : leveling, grooving, hydraulic notching and punching , size-fixed cutting, Pittsburgh lock forming, TDF flange forming, angle-iron flange forming and auto folding. It can produce three types of ducts: “L” shape, “U”  or “square” shape. This line features high automation, high efficiency, low labor cost and less materials usage.

Basic parts:
1.Two sets of electric feeding frames(can put total four coilers)
2.One set of leveling and grooving device
3.One set of holes-punching device for supporting ducts mounting( Customer optional configuration)
4.Punching mounds
5.One set of electric feeding table( the front part)
6.Pittsburgh lock former
7.One set of electric feeding table( the latter part)
8.Duplex angle-iron flange former
9.Duplex TDF flange former
10. TDF hydraulic folder

Working  Principle:
Coiler—leveling and grooving—holes punching for supporting bracket—angle punching and notching—Pittsburgh lock former—duplex angle-iron flange former-- duplex TDF flange former--folding

1. How to get a accurate quotation from us?

Provide us the detail of the material such as metal thickness and width.

 

2. What’s the shipping cost from China to your country?
We can send machine to your port or door address by sea or airplane. Please kindly tell us your nearest port or address with postcode.We have reliable shipping agent to insure the safe, convenient and timely delivery.

 

3. Payment terms, MOQ, warranty, FOB.
Payment terms: 30% TT paid in advance, the balance of 70% before the shipment.
Minimum order quantity: 1 set, FOB Shanghai.
Delivery time :7 days after receipt of formal order and 30% deposit.
Warranty:12 months.

 

4. What’s the package?
Fumigation-free plywood case or without package.

 

5. What about commissioning service?
We can offer commissioning service, the buyer need to afford plane tickets.

 

6. What’s policy for guarantee and broken parts?
Warranty period of equipment lasts a year, during which the broken parts and spares caused by quality can be offered free.

 

 

Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ SellSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]

Trade Alert - Delivering the latest product trends and industry news straight to your inbox.